Signed in as:
filler@godaddy.com
A Grant from Atura Power, Napanee Generating Station and the Town of Greater Napanee made it possible to install a Heat-Pump and Air Conditioning.
The Rectory Used Bookstore veranda got a much needed floor replacement in 2024.
The stairs to the Rectory Used Bookstore were replaced in 2024.
Almost one-and-a-half centuries of rain, snow and ice took a toll on St. Alban's bell tower, cracking the mortar and loosening bricks.
Extensive mortar work in 2022 sealed the tower from further water damage and secured the bricks.
St. Alban's Centre
A Rich Past ~ A Promising Future
General Enquiries 1-613-217-3995 ~ info@stalbanscentre.ca
Copyright © 2024 St. Alban’s Centre - All Rights Reserved
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.